“Modern railway communications go far beyond passenger connectivity,” said Mathew Wegener, National Growth Manager for Rail at telecommunications company BAI Communications.
“They provide the foundation for safer operations, connected workforces, real-time decision-making and future digital rail services.”
Yet for many operators, the starting point is a long way from that.
“Most Australian rail operators are running narrowband systems designed for voice and basic signalling,” Wegener said.
“The hard part is modernising without putting safety-critical communications at risk for a single minute.”
The task for operators is to build a clear pathway from the ageing communications systems in use today to FRMCS-ready 5G.
FRMCS (Future Railway Mobile Communication System) is the next-generation, lower-latency global standard that is designed to replace the 2G-based Global System for Mobile Communications – Railway (GSM-R) over the next decade.
The challenges facing operators
Australian rail operators are entering a period of significant transformation, Wegener said.
“Commuter demand is rising rapidly, driven by population growth, urbanisation and increasing expectations for high-frequency, reliable public transport.
“That demand is arriving just as operators are under pressure to deliver safer, more efficient and more connected rail services.”
Compounding the challenge is the fact that many of the communications networks supporting Australian rail operations are approaching end-of-life.
“These older systems often lack the capacity, flexibility and security needed for next-generation rail operations, from digital signalling and video analytics to IoT (Internet of Things) sensors and predictive maintenance,” Wegener said.
Modernisation has to happen around live operations, he said, and BAI has met that challenge before.
“BAI’s rail heritage runs deep, both locally and globally. Our international expansion two decades ago modernised subway and transit connectivity for rail commuters in Hong Kong, New York and London, and our sister business Boldyn Networks is rolling out a 5G network in Rome.
“That experience is now back working on Australian projects.”
Earlier this year, BAI Communications was awarded a major contract as part of the landmark Sydney Metro West project, as a partner to the successful Metro Trains West Pty Ltd (MTW) consortium.
The contract scope includes delivering a private 5G network enabling operational radio systems, train communications, public safety network connectivity, public mobile connectivity and integrated delivery.
Benefits beyond the platform
Wegener said FRMCS-ready 5G private wireless will deliver critical benefits to safety and service frequency, as well as enabling proactive infrastructure maintenance programs.
“Rail operators, passengers and technicians will feel the benefits,” he said.
“Operators can enjoy real-time data, live video from the corridor, remote condition monitoring and the automation that follows.
“A track worker who can stream to a control room what they are looking at, or pull up an asset record on the spot, is safer and more productive. Safety and operational efficiency improve together.” For passengers, he said, the change will be felt from platform to destination.
“Passengers will stay connected throughout their journey, but the real transformation happens in the unseen network behind it.”
A smooth transition
So, what does a smooth transition to FRMCS-ready 5G look like in practice, and what should operators prioritise to avoid disruption or budget overruns during the migration process?
“The anxiety we hear most often is about disruption mid-transition, and it is well founded,” said Wegener.
“With GSM-R reaching end-of-life, operators must weigh the continuity, complexity and cost of sustaining legacy equipment against a staged move toward 5G and FRMCS.”
Wegener said a well-managed transition rarely looks like a single cutover.
“It looks like extending the life of GSM-R where it still performs reliably, running bearers in parallel through the changeover so trains keep moving, and planning spectrum early,” he continued. He said rail radio in Australia runs on one set of frequencies today (1800 megahertz), and the industry may need to consider the use of another (1900 to 1910 megahertz). Until those arrangements are settled, operators planning to retire GSM-R are working toward a moving target.
“Successful migrations need to be well planned and include extensive use of advanced test environments to fully assess multi-vendor compatibility and reliability.
“Successful execution of the testing phase will ultimately underpin the overall success of the project.”
He said the best-managed migration is the one no-one can tell is happening.
“Rail services continue uninterrupted, while the network quietly becomes ready for FRMCS and 5G-enabled operations.”
Wegener said project success will always rely on highly resilient design architectures that achieve at least 99.999 per cent uptime criteria.
“In most cases, the foundation of the architecture will include an Active/Active core network, with two cores running at once so either can take over if the other fails, backed by a test bed to prove changes or updates before they go live.
“This foundation, complemented by the correct RF resilience designs to keep radio coverage uninterrupted, delivers on the demands of next-generation rail communications systems.
“BAI understands these demands and the associated interdependency requirements of these architectures and how to achieve this complex balance whilst ensuring performance and cost are aligned.”
Delivering next-gen communications
With more rail projects needing to carry critical 5G, multiple mobile network operators and emergency services communications on the same infrastructure, Wegener said success depends on an open, scalable and secure platform that supports multiple users without compromising reliability or performance.
“Services with very different priority, security and assurance requirements have to coexist on one physical network without contending with each other.
“Getting that right requires close collaboration between technology providers, infrastructure partners and rail operators from the earliest stages of project planning.
“BAI has managed critical services on shared infrastructure across broadcast, public safety and rail for decades. That is the experience operators need behind them as they modernise.”